SAN DIEGO, Calif. — November 19, 2026. A San Diego committee is scheduled to consider a proposed $3,968,728.39 change order for the University City Improv 1 project, a package of underground water and sewer work tied to resurfacing and street repairs. If authorized as described in the official briefing, the added work would bring the Ortiz Corporation contract total to $17,125,954.54.
What is included in the project?
The city’s published November 17 agenda briefing identifies contract K-23-2164-DBB-3 and explains that Change Order No. 2 covers added scope for street resurfacing and repair. The underlying University City project involves replacing approximately 1,853 feet of 8-inch water main and 8,325 feet of 16-inch water main, as well as replacing about 8,897 feet of sewer main. The description also calls for abandoning roughly 4,350 feet of older sewer line and rehabilitating another 156 feet.
Associated work includes water service connections, fire hydrants, sewer laterals and manholes, curb ramps, traffic control and restoration of street surfaces. These components can affect access and travel through neighborhoods during construction, but the agenda summary does not identify a verified street-by-street closure schedule or completion date for this change order.
How much more money?
The $3.97 million figure is the requested authorization for additional scope, not an independently verified final invoice or proof of cost overrun misconduct. The $17.13 million figure is the proposed overall contract total. Understanding why the change is needed requires reading the detailed staff report, scope schedule and any change-order justification, not simply comparing the two large figures.
Residents and nearby businesses can ask the city to explain where surface repairs are expanding, whether access will be maintained, and how construction notices will reach affected blocks. The official project documents should also clarify contingency and the division of underground work versus surface restoration.
Status of the request
The change order appears as Item 2 on the Active Transportation and Infrastructure Committee agenda scheduled for November 19 at 1 p.m. As of publication, the committee’s final action and any subsequent required City Council authorization are not independently confirmed. This report covers a scheduled public decision, not a completed contract modification.
Official source: City of San Diego, “The People’s Business — November 17, 2026,” ATI Committee, Item 2.
Support San Diego News
Choose how to support San Diego News:
Credit / Debit Card via StripeChoose your contribution amount on the secure California58 Stripe checkout. One-time support for independent local journalism.
Continue with PayPal Continue with ZelleZelle payments go to Vitaly Ataev Troshin. Please verify the recipient in your bank before sending. Availability depends on your bank.
Optional reader support. When possible, add “San Diego News” to the payment note. Contributions are not advertised as tax-deductible. Support does not influence editorial decisions.More from San Diego News
- San Diego Storm Drain Emergency Contract Could Rise $2.9 Million on Canterbury Drive →
- San Diego Bicycle Master Plan Open for Comment Through November 30 →
- San Diego Reserve Policy Rewrite Would Change Pension, Airport and Solid Waste Funds →
- San Diego IT Contract Ceiling Could Rise $119.2 Million Under CGI Amendment →
- Thanksgiving in San Diego: A 5K in Balboa Park before dinner →
COMMUNITY
Comments
Join the California58 conversation. You must be signed in to comment.
Create a free California58 account or sign in with an available social provider.